EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCruzer
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (43)
Research
- (1)
-
Preparing to Order...
Inspection
- (1)
-
Unpacking and Inventory
Rudder
- (3)
-
Completed
-
Rudder Skeleton...
-
Drilled and Prepped...
Horz. Stab.
- (9)
-
Painting Trim
-
Install Hinge and...
-
Drilled Hinge and...
-
Final Skinning
-
Skinning
-
Reassemble Skeleton
-
Deburring and Priming
-
Front Spar Work
-
Started
Elevator
- (8)
-
Completed
-
Disassemble, Prime,...
-
Trim Tab and Teardown
-
Support Tabs and L's
-
Drilling Hinge,...
-
Top Skin
-
Started Elevator
-
Preparing Elevator
Rt O/B Flprn
- (2)
-
Work on Right...
-
Started Right...
Lt O/B Flprn
- (3)
-
Outboard Flaperons...
-
Work on Left...
-
Started Left...
Rt l/B Flprn
- (1)
-
Built Right Inboard...
Lt I/B Flprn
- (1)
-
Built Left Inboard...
Right Wing
- (14)
-
Bottom Skins Riveted
-
Reassembly of Bottom...
-
Reassembly of Bottom...
-
Deburring for Hours!
-
Leading and Trailing...
-
Bottom Skins
-
Fitting Bottoms Skins
-
Lower Skin Started
-
Wiring for...
-
Wiring for...
-
Skeleton Assembly
-
Spar Prep
-
Fixing Factory Mistake
-
Skeleton Assembly
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 750 Cruzer
-
VIEW REPORTS
Total Hours:
116.1
Start/Last Date:
Dec 27, 2020 - No Finish Date
Engine:
Viking 130
Panel:
Custom (GlassPack)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCruzer
Home or Last Project Picture
May 01, 2021
Install Hinge and Tip Plastics
- (3.2 hours)
Category: Horz. Stab.
Installed hinge (had to cut and trim to clear tip ribs), installed trailing edge tips ribs, and painted the plastics.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.